Official Citizens Information guidance last edited on 20 October 2026 explains the Solar PV Electricity Grant, which the Sustainable Energy Authority of Ireland administers to help with the cost of buying and installing solar photovoltaic panels and a battery storage system. Before you get panels or a battery and start any work, you must apply for the grant and get a grant offer from the SEAI, and you must complete the work within 8 months of the offer, the official page said. The work must be finished before you can get payment. This report summarizes that guidance and is not an application decision.

On 6 October 2026, the grant was expanded to include homes built and lived in before 2025, compared with a previous cutoff of before 2021; a grant for a solar battery storage system; and an enhanced grant if you are getting a qualifying social welfare payment, or you are renting to a long-term Rental Accommodation Scheme tenant in Dublin. You can apply for a property you own if you are living in it, a landlord, an owner management company, or an approved housing body.

The official table lists a standard Solar PV grant of €700 for 1 kWp, €1,400 for 2 kWp, €1,600 for 3 kWp, and €1,800 for 4 kWp, and an enhanced grant of €3,350, €6,700, €7,550, and €8,400 at those same sizes. Qualifying payments for the enhanced grant include Fuel Allowance, Working Family Payment, Jobseeker's Allowance for over 6 months with a child under 7, Disability Allowance for over 6 months with a child under 7, Domiciliary Care Allowance, One-Parent Family Payment, and Carer's Allowance if you live with the person you care for. A separate battery grant is €600 for a battery of 5 kWh or larger.

The grant covers materials and labour, unless you are a contractor doing the work in your own home, in which case only materials are covered. If the actual cost including VAT is less than the maximum grant, you get a grant for the actual cost, the official page said. A 0% VAT rate applies to the supply and installation of solar panels on private residences and schools. You can receive the grant only once, and you must get approval before installation.

People who depend on life-protecting electrical medical equipment, such as a dialysis machine or respirator, may be able to get a free system of up to 4 kWp of panels and a battery of up to 5 kWh if they, or a household member, are registered in the life-support category of their electricity supplier's Priority Services Register and the house was built and occupied before 1 January 2025. Applications go through the SEAI portal or by post. This summary does not replace official SEAI instructions.